Site Quality Procedures
Inspection and test points defined per element, with hold points agreed before work reaches them.
- Inspection and test plans
- Hold and witness points
- Records kept per element
Material inspection, workmanship checked against the approved specification, and safety coordination running alongside the works.
Quality control is mostly about timing. The same defect costs nothing to fix before a pour, something to fix during finishing, and a great deal to fix after handover. Inspection at the right stage is not bureaucracy, it is the cheapest moment to be right.
We work to the approved specification rather than to a general standard, keep records per element, and run safety coordination alongside the works rather than as a separate exercise nobody reads.
Inspection and test points defined per element, with hold points agreed before work reaches them.
Deliveries checked against the approved submittals on arrival, not after they are built into the works.
Executed work checked against the approved specification while the responsible trade is still on site.
Concrete cubes, compaction, pressure, and continuity testing carried out and filed against the element tested.
Access, edge protection, lifting, and method statements coordinated as part of running the site.
A selection of our recent work demonstrating precision craftsmanship and architectural excellence across the Chouf, Mount Lebanon, and Beirut.
With over 20 years of combined experience across Beirut, the Chouf, and Mount Lebanon, our engineering firm has the expertise to bring your vision to life. Let's create something extraordinary together.
Our team is based in Baakleen, Chouf, and works with clients across Beirut, Mount Lebanon, and beyond. Reach out for a free consultation — we'd love to hear about your project.
We keep inspection records per element, so a question about a specific slab or wall months later has an answer rather than an opinion.