Plastering & Screeds
Substrate preparation, plaster, and floor screeds set to the finished levels the following trades need.
- Internal and external plaster
- Floor screeds to level
- Substrate preparation and repairs
Interior and exterior finishing: plastering, tiling, painting, cladding, ceilings, partitions, waterproofing and facade treatments.
Finishing is judged closer up than any other trade. Nobody inspects a foundation, but everyone runs a hand along a tile joint. The work is in the setting out, the substrate preparation, and the sequence, because a finish is only as good as what it was applied to.
We keep waterproofing and facade treatments in the same package as the visible finishes deliberately. Separating them is how a good looking wall ends up staining two winters later, and the client pays twice.
Substrate preparation, plaster, and floor screeds set to the finished levels the following trades need.
Tiling and stonework set out from the room, not the corner, so cuts land where they are least visible.
External cladding, stonework, and facade treatments detailed for mountain exposure and fixed back to the structure properly.
Wet areas, roofs, terraces, and below-ground, applied and tested before anything covers it.
Gypsum ceilings and partitions coordinated with services above, then paint and final decoration.
Projects where this work was part of Group Four's scope.
Group Four brings more than 20 years of industry experience to every site. Send us the plot location and the drawings you have, and we will tell you how we would run the job.
Our team is based in Baakleen, Chouf, and works with clients across Beirut, Mount Lebanon, and beyond. Reach out for a free consultation — we'd love to hear about your project.
Facade and external finishes take a beating in a Chouf winter. Detailing that suits mountain exposure is not the same as detailing that suits Beirut, and we build for the site we are on.