01
Site Mobilisation & Setting-Out
Site establishment, temporary works, and access. Setting-out is checked against the approved drawings and the plot boundaries before excavation starts.
- Site establishment and temporary works
- Survey control and setting-out
- Excavation and earthworks
02
Structure & Envelope
Foundations, retaining walls, slabs, columns, and beams in reinforced concrete, then blockwork and the building envelope. Waterproofing goes in while it is still accessible.
- Foundations and reinforced concrete frame
- Blockwork and envelope
- Waterproofing and insulation
03
Finishing & MEP Coordination
Plastering, tiling, painting, cladding, ceilings, and partitions, sequenced against the mechanical, electrical, and plumbing installation so service routes are agreed with the structure first.
- Interior and exterior finishing works
- MEP, HVAC, and low-current coordination
- Trade sequencing and subcontractor control
04
Quality & Progress Control
Materials inspected on delivery, workmanship checked against the approved specification, and shop drawings reviewed against actual site conditions.
- Material inspection and QA/QC records
- Shop drawing review and technical queries
- Progress reporting and site safety
05
Handover & Documentation
Snagging, testing, and commissioning coordination, then handover with as-built drawings and testing records rather than keys and a verbal assurance.
- Snagging and defect closure
- Testing and commissioning coordination
- As-built drawings and handover file